Section one: Success for the past week

#1 Team realignment-- after a long break we needed to get back into the swing of things and consider where we are and where we are going from a realistic point of view.
#2  G and Mark are heading to Boise to promote our project.

 

Section two: Tasks completed for the past week 

The WBS has been altered to fit in with the Advisor Reort, There has been nothing added to the list but there have been tasks and outcomes.
see WBS

owner
 supportdescription of outcomes
value to project 
 G none set-up Path meeting and Boise capitol PR visit
 continueing PR exposure
 WM none
 
 
 Matt   
 Diana none

 How to achieve success in the coming weeks

working on different designs with the gourd prototype 

 This will help by sharing my thoughts on how to achieve success.

Making more than one prototype for me to test will be beneficial so I can see which designs work better. 

 Nick none project success in the next five weeksprovide direction and outcomes for the next five weeks.
 Marknone
Trip Preperation
 Obtain vaccinations and Visas. 

 

Section three: Issue/Challenges for the coming week

#1 We are entering a critical time in the project, there is alot of attention being brought to our project and the designs do not live up to the hype, we have a very challenging week of design and evalution of the existing prototypes.

#2 By COB Thursday. A spec document for each filter (3) that will go to 
Kenya.  Each spec document must meet the quality criteria described 
in our text (ulrich & eppinger).  Specs must describe a filter that 
has high flow rate, safe water, and ease of use.

#3 After every member provides there view of project success in the next five weeks it is imperative that we all decide on direction and s.m.a.r.t outcomes that will be achived in the next five weeks. 

Section four: WBS for the coming week -more to be added during the meeting tomorrow

owner support
description of outcomes
Value to project
 G   
 WM   
 Matt   
 Diana   
 Nick   
 Mark 

Water Quality Tests:
Direct Microscopic Counts
Total Coliform
Fecal Coliform
BOD
COD
Enterococcus

Prototyping:
One working prototype




Objectives are to obtain laboratory
procedures for each of the tests.
Summerize materials needed and
costs associated with materials.
Resolve international issues with transportation.
Purchase and pack by Feb. 7th




Create one working prototype from Clay, Moringa and Carbon.  Quantify microbial removal by spectrophotometer.  Quantify flow rate.   

 
 
 