Values to project outcomes 

 Phase 0ne
research
and project learning

 1.01

wm 

mngmt 

COB-9/21

Team

 1h

 100%

Initial wiki structure is set up                             

 1.02

 gmc

 10,5

COB-10/15

 

 2h

 100%

Contact Lions Club/Confirm Presentation

 1.12

 gmc

  10, 5

COB-10/20

Team

 2h

 100%

Prepare 20 minute presentation for Lions Club

 1.03

 gmc

 10, 5

COB-10/2 

Team/UI 

 6h

100%

Turn in Proposal for Sustainability Grant

 1.13

 gmc

 10, 5

COB 10/18

 UI

 -

100%

Receive Award/Grant (notification no later then 10/18)

 1.04

BIO

 2,6

COB-10/12

Team

10+

 100%

Exp 1. Biological degredation of E. Coli by Moringa Oliefra

 1.05

 MECH

 1, 8

COB-10/18

Team 

10+

100%

Model/optimize flow through porous media

 1.15 MECH

1, 8

COB-10/13

    Team   3h+   100%Make scaled filters to study variable thicknesses (>=3)
 1.25 MECH

1, 8 

COB-11/2

Team

 3h+

 100%

Make New Filters and Design Concepts (at least 2) 

 1.06

 Team

 10

-

Team

 -

 5%

Create Non-profit Organization

 1.07

 Team

 1

CNT

Team

 3h

 90%

SEM/X-Ray Defraction Experiment

 1.08

 Mech

  1, 8, 4

COB-10/10

 Wiki

 4h

100%

Collect and disseminate Knowledge on filter material properties

1.09

Team

4, 5, 10

COB-10/24

Kali

2h

100%

Write 2x "Reflective Summary" reports for Kali

 Phase two
Product design
& development
+cont'd research

 2.01 Bio 2,3,4,6,8 COB-12/05

Team

 3h

 33%

 Coliform Test/ Field Tests/ Field kit Prep.

 

 2.02

 Bio

2,3,4,6,8 

COB-12/6 

Team 

1hr 

 20%

 Develope microbe specifications. 
 2.03Mech  2,3,4,6,8  COB-12/6 

Team 

1hr 

 20%

 Develope flowrate specifications
 2.04Bio/Mech 

 2,3,4,6,8  

 COB-11/19 

Team 

 .5hr

 95%

 Make a list of material needs for prototyping, experimenting and learning.
 2.05Each Pair  2,3,4,6,8 COB-12/1 

Team 

 1 hr

 50%

 Construct and document knowledge on different ways to produce clean water, post on wiki.

2.06Each Pair  2,3,4,6,8 COB-12/1 Team  2-3hr

 5%

 Two working prototypes

2.061

 G and M  2,3,4,6,8  COB-11/29 Team 2-4hr 95% Several Test Disks (6) and Flow Study w/Mixtures
 2.07 GMC  10, 5COB 11/13 Team 2hr 100% Student Grant Proposal - Team and Individual
        