jan25thmeetingTeam Meeting 1-26-07 I. Reports a. Lloyd - Pattent paperwork finished today. b. Chris - Colby - Bart - Built 2 shirts, un-stretched inductor sections were measured at 4 mH. c. Jeff - Business team is formed, will begin regular meetings soon. d. Jen - Took measurement on breathing infant model. - Ordering info: 94.50 with 30 days to return - Talked to forestry department about injection molding. We need to give them physical dimensions of the pieces we want made. - The textile department has invited us to give a presentation at their meeting next Thursday at 6:30pm in the textile department. Jen - Jeff - Chris and Bart will be there.
II. New Business a. Detailed design review (teleconference with Dale) - To take place sometime between Feb 1st and Feb 15th. - Chris will make arrangements with Dale
III. Action items a. Chris - make arrangements with Dale for the design review. - Look into obtaining or making a spring to replace the variable inductor. b. Colby - Order infant model c. Bart - Redo drawing for stress model. d. Jen - Get in contact with ITAA and check up on the federal regulations regarding sleepwear.
|