Sleep Sound

jan25thmeeting

Team Meeting
1-26-07
 
I. Reports
a.  Lloyd - Pattent paperwork finished today.
b.  Chris - Colby - Bart - Built 2 shirts, un-stretched inductor sections were measured at 4 mH.
c.   Jeff - Business team is formed, will begin regular meetings soon.
d.  Jen -  Took measurement on breathing infant model.
             - Ordering info:  94.50  with 30 days to return
             -  Talked to forestry department about injection molding.  We need to give them physical dimensions of the pieces we want made.
             -  The textile department has invited us to give a presentation at their meeting next Thursday at 6:30pm in the textile department.
                 Jen - Jeff - Chris and Bart will be there.
 
II.  New Business
 a.  Detailed design review (teleconference with Dale)
      -  To take place sometime between Feb 1st and Feb 15th.
      -  Chris will make arrangements with Dale
 
III.  Action items
a. Chris - make arrangements with Dale for the design review. 
             - Look into obtaining or making a spring to replace the variable inductor. 
b. Colby - Order infant model
c. Bart - Redo drawing for stress model.
d. Jen - Get in contact with ITAA and check up on the federal regulations regarding sleepwear. 
 

 
 
 

Last Modified 1/25/07 10:04 PM