Sleep Sound

October 4th Meeting


 Agenda
Meeting Goals

  • Create a Prototype Airbed Monitor
  • Determine the viability of a Strain Gauge and a Pressure Gauge to monitor Breathing

Meeting Plan

1.  Setup the Airbed
     We will start out by setting up the airbed and the monitors.  Please remember that:
  • Colby will bring the air mattress
  • Chris is bringing strain gauges
  • Jennifer, Bart, Lloyd will be working on finding some pressure gauges
2.  Test the Bed
     Next up, we'll lay down on it, and breath.  Hopefully, we'll see a result on the monitors

3.  Evaluate the prototype
     Finally, we'll talk about the design, decide on the strengths and weaknesses of the air mattress design.

Meeting Location

BEL - Senior Design Laboratory
5:30pm on October 4th, 2006

 
 
 

Last Modified 9/29/06 2:39 PM