Existing 15kVA transformer:
- Gather data relating fault currents to phase voltage
- Determine relation between fault and load currents
- Obtain fuse elements capable of protecting transformer
Shorting mechanism:
- Detailed fault current modeling
- Thermal analysis for conductor sizing
- Size fuses to clear fault within 2-3 cycles
- Safe enclosure designed for fuse bank
Test bench design:
- Obtain dimensions of transformer
- Bench must be functional and aesthetically pleasing
Final testing with 55kVA transformer:
- Fault signature not as apparent in phase quantities
- Filtering with MathCAD relay model necessary to determine fault signature