Following are images of parts of the initial setup of the test circuit connected to an existing 25kVA transformer.
transformer setup
Above is the 25kVA transformer.
test circuit
The power came from the wall and went into a variac (variable transformer) then went into the test table (seen here on the left). Then the current went through the current transformers and into the transformer.
test circuit
On the other side of the transformer, the current goes into the resistor bank (on the right side of the image) which is simulating a load. In the above picture there is a current meter (with red clamps) on the shorting circuit.
existing 25kVA transformer
The existing 25kVA transformer is being used for initial testing while we wait for the transformer we specified and ordered.
Home  |  Problem Definition  |  Goals  |  Transformer Theory  |  Test Circuit  |  Testing  |  Thermal Analysis  |  Archive  |  Team

For problems or questions regarding this web site, contact eevicmaki@vandals.uidaho.edu
Last updated: 4/25/07.
University of Idaho, Moscow, Idaho.