What's New

  • 10/4/05 @ 9:30 am -Team tour with Idaho National Laboratory
  • 10/13/05 @ 3:30-5:00 pm - Senior Design Snapshot in Mindworks
  • 10/27/05 @12:30 pm - Testing surrogate material
  • 11/9/05 @ 3:30 pm - More testing of surrogate material
  • 11/15/05 @ 12:30 pm - Conceptual Design Review in Mindworks
  • 12/6/05 @ 3:30-5:00 pm - Senior Design Snapshot in Senior Design Suite
  • 12/6/05 - Design Proposal Report
  • 2/6/06 @ 2:30 pm - Design Review in CNR14-IF4
  • 2/27/06 @ 2:30 pm - Building the prototype in Senior Design Suite
  • 3/1/06 @ 2:30 pm - Building the prototype in Senior Design Suite
  • 3/24/06 @ 8:00 am - Building the prototype in Senior Design Suite
  • 4/10/06 @ 2:30 pm - Calibration testing of prototype in Senior Design Suite
  • 4/20/06 @ 2:30 pm - Surrogate testing in the prototype in Senior Design Suite
  • 4/28/06 @ 9:00 am to 3:00 pm - College of Engineering EXPO in Student Union Building

 

 

 

 

 


                                      

Home | Project Description | Design Ideas | Design Solution | Manufacturing | Surrogate Material | Project Archives | Lessons Learned | Team Members

 

The content of this site belongs to the University of Idaho SCUPRA senior design team.

The content cannot be reproduced without permission from the authors.

For problems or questions regarding this Web site contact [scupra@uidaho.edu].
Last updated: 05/02/06.