Short-circuit tests were run on the new transformer.

Tests were run while short-circuiting the transformer and measuring the current in and out (to the load) of the transformer. Currents were graphed.

Initial observations:
  • Shorted phase shows higher current in and lower current out.
  • Smaller percentage shorted, the less obvious is the difference in currents.
  • The shorted current is much higher than the other currents.
  • From a 10% short, down to a 6% short, the shorted current increases--then it decreases on the 4% short.

Graphs of current:

The following graph shows a
2% short with 50 Amps of load current.
Graph 2
The following graph shows a 2% short with 90 Amps of load current.graph 1
Home  |  Problem Definition  |  Goals  |  Transformer Theory  |  Test Circuit  Testing  |  Thermal Analysis  |  Archive  |  Team

For problems or questions regarding this web site, contact eevicmaki@vandals.uidaho.edu
Last updated: 4/26/07.
University of Idaho, Moscow, Idaho.