Resources

 

Team Minutes

2/1/2010

2/8/2010

2/16/2010

3/1/2010

3/8/2010

3/22/2010

3/29/2010

4/5/2010

4/12/2010

4/19/2010

4/26/2010

 

Lab Work

Hysteresis Run 1

Hysteresis Run 2

Spin Down

 

Management Schedule

 

Interim Design Report

 

Design Review Slides